PROFILE
Senior
SAP PS Consultant, expert in PS implementation/configuration, with 20 years
professional experience in multinational companies, Telecom, Consulting (FINAL
CLIENTS) and Automotive sectors.
Excellent organisational skills, methodic, systematic and analytical
with good initiative and a commercial focus. Accustomed to regularly using
English in international projects and a good knowledge of French and Italian.
Experience summary
Consulting:
|
Manufacturing:
|
Consultant SAP R/3, (PS, SD, MM, CO, FI, IM, CS), expert in PS implementation.
Pricing/Cost analysis, budgeting of the
department and Marketing
|
Proccess Engineering & Industrializing
Electronic Mounting of PBA’s
Disigning of Electronic authomatic Assembling
Lines (A Robotic Line for THROW HOLE
Componnents and a SMD Line),
|
PROFESSIONAL
EXPERIENCE
CAP GEMINI
SAP Consultant
Jun - Dec 2004
MAIN
PROJECTS
Project CIMPLIFY Roll Out
Implementation of SAP R/3, Release 4.6C
modules of PS integrated to IM, and FI-CO, in HOLCIM for
projects management of Cement Sector .
Main steeps finaliced with success:
The customizing of the System.
The final Configuring with the customer.
The testing of system.
Training of Key users
and user manual designing.
After Go-Live assistance and support.
Data Migration, using LSMW (Legacy) .
Jun
2004 – dec 2004
FUNCTIONS AND TASKS
Customized and configured the system
for the implemention of SAP R/3, integrated to IM, and
FI-CO.
- Implemented PS, IM, MM, FI,CO modules including
Projects, Work Breakdown Structures, Networks, Milestones and Earned Value
Analysis, Info System and Cost Control, coordination of the process for the Business
Units; Investment Programs, Budget Availability Control;
MM, Supliers orders;
FI-CO, accounting management, Cost controlling, Cost element accounting,
Informatin system. & Settlement.
- Total Configuration and customizing in PS, IM, CO -FI.
ATOS ORIGIN
SAP Consultant
2003 - 2004
MAIN
PROJECTS
Project TRADEBE Full live cycle
Implementation of SAP R/3, Release 4.6C
modules of PS integrated to MM, SD and FI-CO, in one group company (ABT) for
projects management of Environmental Engineering and water treatment.
Main steeps finaliced with success:
Blue Print with all the
Requisitions&Solutions of final Customer.
The customizing of the System.
The final Configuring with the customer.
The testing of system.
Training of Key users and Final Users
and user manual designing.
After Go-Live assistance and support.
Oct
2003 – jun 2004
FUNCTIONS AND TASKS
Led
the Project Organisation for the implemention of SAP R/3, Release 4.6C modules PS, linked to MM, SD and
FI-CO. I had a
small team of a junior Consultant dedicated full time to help me in the areas
of SD and PD, other senior working in FI-CO,
and one Programmer by hours, for some developments required by the
customer.
- Implemented PS, SD, MM, FI,CO modules including
Projects, Work Breakdown Structures, Networks, Milestones and Earned Value
Analysis, Capacity Requirements and resources management, Time Scheduling,
Info System and Cost Control, coordination of the process for the Business
Units; SD, customer orders, with Billing Plan linked to milestones Netw;
MM, Supliers orders, with Invoicing Plan linked to milestones Netw.;
FI-CO, accounting management, Cost controlling, Cost element accounting,
Informatin system. Resault Analisys & Settlement.
- Total Configuration and customizing in PS.
ERICSSON SPAIN S.A. 1987 - 2003
SAP Consultant
1997 – 2003
MAIN
PROJECTS
Project MUS, (Market
Unit Solution), Roll Out
Implementation Jan 2002 – Feb 2003
SAP Functional Consultant June 2001 – Dec 2001
B2B Implementation Project Jan 2001 – June 2001
Euro Conversion Project Jan
2000 – Dec 2000
MERCURY Project of re-engineering Jan
2000 – Dec 2000
System Upgrade Project June
1999 – Dec 1999
Y2K Conversion Project (simultaneous) June
1999 – Dec 1999
Fusion Project Jan 1999 – June 1999
Project UNE (SWITCH sales
division), Complet cycle Implementation, Jan
1998 – Dec 1998
Project UNE (RADIO sales
division ) , Complet cycle
Implementation, May 1997 – Dec 1997
MAIN
PROJECTS IN ERICSSON
Summary
of Project MUS, (Market Unit Solution), Roll Out Implementation SAP R/3, Release 4.6C Jan 2002
– Feb 2003
Module PS linked to MM, SD and FI-CO, in
ERICSSON SPAIN for projects management of telecom
(Switch, Radio and Transmision).
Main steeps finaliced with success:
Small customizing of the System,
adaptating to business requirements.
The final Configuring and master Data.
The testing of system.
Training of Key users and Final Users.
And after Go-Live assistance and
support.
FUNCTIONS AND TASKS
Led
all the coordination of several areas (60 persons including Final Users, key
users and other managers) for the implemention of SAP R/3, Release 4.6C modules PS, linked to MM, SD and
FI-CO. I belong to
the team
- Implemented PS, SD, MM, FI, CO, CS and CATS including
Projects, Work Breakdown Structures, Networks, Milestones and Earned Value
Analysis, Capacity Requirements and resources management, Time Scheduling,
Info System and Cost Control, coordination of the process for the Business
Units; SD, customer orders, with Billing Plan linked to milestones Netw;
MM, Supliers orders, with Invoicing Plan linked to milestones Netw.;
FI-CO, accounting management, Cost controlling, Cost element accounting,
Informatin system. Resault Analisys & Settlement.
Project
UNE (SWITCH sales division), Complet cycle
Implementation, Jan 1998 – Dec 1998
Project
UNE (RADIO sales division ) , Complet cycle Implementation, May
1997 – Dec 1997
Module PS linked to MM, SD and FI-CO, in
ERICSSON SPAIN for projects management of telecom
(Switch, Radio and Transmision).
Main steeps finaliced with success:
Customizing of the System, adaptating to
business requirements helped by the seniors consultant of the team.
The final Configuring and master Data.
The testing of system.
Training of Final Users.
Assistance and support.
FUNCTIONS AND TASKS
Led
all the coordination of several areas (70 persons including Final Users, key
users and other managers) for the implemention of SAP R/3, Release 3.0D modules PS, linked to MM, SD and
FI-CO. I belong to
a big team.
- Implemented PS, SD, MM, FI, CO, CS and CATS including
Projects, Work Breakdown Structures, Networks, Milestones and Earned Value
Analysis, Capacity Requirements and resources management, Time Scheduling,
Info System and Cost Control, coordination of the process for the Business
Units; SD, customer orders, with Billing Plan linked to milestones Netw;
MM, Supliers orders, with Invoicing Plan linked to milestones Netw.;
FI-CO, accounting management, Cost controlling, Cost element accounting,
Informatin system. Resault Analisys & Settlement.
SUMMARY OF
ALL FUNCTIONS AND TASKS
- Implemented
PS, SD, MM, FI,CO, CS,CATS modules including Projects, Work Breakdown
Structures, Networks, Milestones and Earned Value Analysis, Capacity
Requirements and resources management, Time Scheduling, Info System and
Cost Control, coordination of the process for the Business Units.
Configuration and customizing in PS.
- Changed
management: presentations, training and support to key users. Designed the training programme and material.
- Business
process consulting and design, Analysis of project management processes
for instalation projects and
redesign of processes .
- Checked the Accounts, Activity Types and Cost Centers in the
Networks. Cost/Revenues Reports.
- Requierements analysis for an executive information
system. Designed and produced general and specific reports.
- Produced Master Data. –
-
Material master for PS, Standard Networks, P-codes, Standard milestones,
Workcenters.
- FI-CO, Activity Types
and Cost Centers, , Assign Workcenters to Cost Centers . Design,
develop and configure shop floor hierarchy including cost center, work center
and activity type relationships for planning, scheduling, execution and
reporting.
- Materials of SD .- Pricing, Billing Plan and linking for create
a project (PS).
-
Materials of MM for Standard services, Service master management, Model serv.
Specification, (Service Catalog).
- Customising of relevant PS
functionality, project profile indicators, Project coding, Estándar
Networks, Control Key, network profiles, user defined fields, responsible,
applicants, Project definition.
- Good
knowledge and experience the Customising
of SD, Sold to Party, Sales order types, Creating, Quotations, Enhanced sales
documents, Pricing, Reports in sales,
processing with Networks/Projects (PS). Down Payments for Sales
Orders, Billing Plan, Invoicing, P-codes managements.
- Good
knowledge and experience in FI-CO, accounting management, Cost
controlling, Cost element accounting, Informatin system. Resault Analisys
& Settlement.
- Testing.-
Developed testing scripts and scenarios. Final acceptance testing.
- Reduced
WIP by 80%, from 30 M Є to 6 M Є,
through the optimization and redesign of business processes in SAP
R/3, Release 4.5B .
- Provided technical expertise in the assessment of business
requirements in modules, PS, SD, MM, FI, CO..
- Prepared
in SAP R/3, Release 4.5B modules
PS, MM, SD, FI, CO for the introduction of the EURO.
- Re-engineering
and Updated the standard system PS, to SD + NETWORK – SAP R/3,
Release 4.5B .
- Designed
and produced general and specific reports.
- Adaptation
to 2000 Impact, in SAP R/3,
Release 4.5B modules PS, MM, SD, FI, CO
- Upgrade
of the system SAP R/3, to Release
4.5B in the PS, SD, MM, FI and CO modules, maintaining processes,
with Work Breakdown Structures (WBS), Networks, Milestones.
- Defined
Project Management processes (PS, SD, MM, FI CO) for the fusion of the two
main divisions of the Company to form ERICSSON ESPAÑA S.A.
- Implementation
of the system SAP R/3 Release 3.0D PS, SD, MM, FI CO modules, in the
division of Ericsson TELECOM
(INFOCOM) Sales division, with the same functions as in the First Phase
but with more complexity.
- Implementation
of the system SAP R/3 Release 3.0D PS, SD, MM, FI CO modules, in the
division of Ericsson Radio Sales
division.
- Formed
part of the implementation team for the PS, SD, MM, FI, CO modules,
including; Work Breakdown Structures (WBS), Networks, Milestones and
Earned Value Analysis, Time Scheduling and Cost Control, liaison with the
Business Units during the process.
- Provided
assistance and support in PS, SD, MM, FI, CO modules, after the go-live.
Process
Manager 1987 – 1997
Responsible for Process Engineering &
Industrializing, Electronic Mounting of PBA’s in Madrid (Leganés) Factory.
- Prepared,
optimized and produced process controls.
- Prepared,
maintained and improved production SW.
- Trained
the production, maintenance and engineering personnel.
- Established
production processes using Just-In-Time and Kanban techniques.
- Carried
out improvement studies for work stations, rationalization, lay outs,
set-up and maintenance of work station software.
- Responsibility
for new process budget and various work teams.
- Profitability
and productivity analysis.
- Design,
analysis, selection, installation, set up and maintenance of manual and
automatic assembly line processes, auxiliary equipment (automatic stores,
etc.), Through Hole Technologies and SMD.
- Designed
electronic automatic assembling lines (A Robotic Line for THROUGH
HOLE Componnents and a SMD Line).
AUSTIN ROVER SPAIN S.A. 1984 - 1987
Pricing Analyst
- Pricing
analysis, department budgeting and spare parts marketing.
- Automatization
of the analytic methodology.
- Reports
and liaison with European headquarters of Spare Parts in Cowley (Oxford),
UK.
EDUCATION
·
EUROPEAN
ENGINEERING DEGREE (FEANI: EUR ING) - Mechanical Engineering
Universidad Politécnica de Madrid
·
Masters
Degree in Systems
Universidad Pontificia de Salamanca
·
Masters
Degree in Commercial Engineering (Industrial Marketing)
Universidad Politécnica de Madrid
LANGUAGES
·
Spanish
– Native language
·
English
– High level, accustomed to working in English.
·
French
– Intermediate level
·
Italian
– Intermediate level
PROFESSIONAL TRAINING
SAP:
Various
SAP R/3 Consultancy courses including;
·
(PS,
SD, MM, FI CO)
·
CA080
(Introduction PS)
·
CA850
(PS Configuration)
·
LO525
(Configuration and Organization)
·
LO020 (Processes in
Procurement)
OTHER PERSONNAL DATA.- Born Date: 29th of October of 1957, in Avila Spain. I’m married.
|